0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Spišské Podhradie D1 Motorway Bridge

General Information

Name in local language: Estakáda Spišské Podhradie na diaľnici D1
Beginning of works: 2009
Completion: 2012
Status: in use

Project Type

Location

Location: , ,
, ,
Part of:
Coordinates: 49° 0' 29.65" N    20° 43' 2.15" E
Show coordinates on a map

Technical Information

Dimensions

total length ca. 699 m
deck width 2 x 11.75 m
longitudinal slope 1.05 %
superelevation 2.5 %
arches span lengths 55.00 m - 65.00 m - 3 x 75.00 m - 65.00 m - 55.00 m
number of spans 7
piers deck depth at abutments 12

Materials

piers reinforced concrete
arches steel
deck slab reinforced concrete
abutments reinforced concrete
cross beams steel
piers on arch steel

Participants

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20061104
  • Published on:
    02/09/2011
  • Last updated on:
    29/04/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine