General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Material: |
Steel-prestressed concrete composite bridge |
Structure: |
Rigid frame bridge |
Support conditions: |
for registered users |
Location
Location: |
Emmerich am Rhein, Kleve (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | Speelberger Straße |
Crosses: |
A 3 Motorway (Germany) (1984)
|
Coordinates: | 51° 51' 38.46" N 6° 16' 15.06" E |
Technical Information
Dimensions
width | 8.80 m | |
total length | 58.52 m | |
span | 39.60 m | |
bridge surface | 515 m² | |
deck | deck depth | 1.18 - 2.51 m |
Quantities
structural steel | 70 t | |
concrete volume | 1 185 m³ | |
prestressing steel | 6 t | |
reinforcing steel | 76 t |
Cost
cost of construction | Euro 3 000 000 |
Materials
deck slab |
precast prestressed concrete
(C 60/75)
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 30. Dresdner Brückenbausymposium, 9./10. März 2020, Dresden (Germany), pp. 227. (2020):
- About this
data sheet - Structure-ID
20077170 - Published on:
04/04/2019 - Last updated on:
10/06/2022