General Information
Other name(s): | Confusion Hill Bridge (South) |
---|---|
Beginning of works: | June 2006 |
Completion: | 2009 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Haunched girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Leggett, Mendocino County, California, USA Garberville, Mendocino County, California, USA |
---|---|
Crosses: |
|
Coordinates: | 39° 55' 15.75" N 123° 45' 48.20" W |
Technical Information
Dimensions
main span | 174 m | |
height | 76 m | |
total length | 413 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Chronology
June 2006 | Beginning of construction. |
---|
Participants
Owner
- Kevin Harper (project engineer)
Construction engineers
Main contractor
Prestressing
Form travelers
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20041246 - Published on:
14/12/2008 - Last updated on:
05/02/2016