General Information
Name in local language: | Sørstraumen bru |
---|---|
Completion: | 20 June 1980 |
Status: | in use |
Project Type
Structure: |
Single-cell box girder bridge |
---|---|
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Kvænangen, Troms og Finnmark, Norway |
---|---|
Address: | E6 |
Coordinates: | 69° 50' 25.32" N 21° 53' 4.53" E |
Technical Information
Dimensions
main span | 120 m | |
total length | 440 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Excerpt from Wikipedia
Sørstraumen Bridge (Norwegian:Sørstraumen bru) is a cantilever bridge that crosses the Sørstraumen in the inner part of the Kvænangen fjord. The bridge lies just west of the village of Sekkemo in Kvænangen Municipality in Troms county, Norway. The 440-metre-long (1,440 ft) bridge has a main span that is 120 metres (390 ft) long. The prestressed concrete bridge is part of the European route E06 highway.
Text imported from Wikipedia article "Sørstraumen Bridge" and modified on July 23, 2019 according to the CC-BY-SA 4.0 International license.
Participants
Design
Relevant Web Sites
- About this
data sheet - Structure-ID
20008173 - Published on:
12/02/2003 - Last updated on:
01/06/2017