General Information
Project Type
Structure: |
Haunched girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge |
Structure: |
Box girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Soria, Soria, Castile-Leon, Spain |
---|---|
Crosses: |
|
Coordinates: | 41° 46' 59.86" N 2° 27' 18.97" W |
Technical Information
Dimensions
total length | 173 m | |
span lengths | 32.00 m - 105.00 m - 23.00 m | |
number of spans | 3 | |
deck | deck depth | 2.25 - 5.25 m |
deck width | 13.00 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Experiencias en puentes construidos por el sistema de avance en voladizo sucesivo. In: Hormigón y acero, v. 42, n. 180 (3rd Quarter 1991), pp. 109-118. (1991):
- About this
data sheet - Structure-ID
20076330 - Published on:
06/11/2018 - Last updated on:
06/11/2018