General Information
Project Type
Function / usage: |
Hydroelectric dam / plant |
---|---|
Structure: |
Zoned embankment dam |
Material: |
Concrete dam |
Structure: |
Buttress dam |
Location
Technical Information
Dimensions
spillway capacity | 10 000 m³/s | |
annual power generation | 2 796 GWh | |
dam structure 1 | height | 35 m |
crest length | 225 m | |
dam structure 2 | height | 8 m |
crest length | 200 m | |
embankment | height | 20 m |
crest length | 328 m | |
spillway | height | 20 m |
crest length | 135 m |
Participants
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- L'aménagement hydroélectrique de Song Loulou, au Cameroun. In: Travaux, n. 560 (November 1981), pp. 33-40. (1981):
- Les ouvrages de retenue de l'aménagement hydro-électrique de Song Loulou (République Unie du Cameroun). In: Travaux, n. 564 (March 1982), pp. 116-121. (1982):
- About this
data sheet - Structure-ID
20009485 - Published on:
25/06/2003 - Last updated on:
23/05/2022