Beginning of works: July 1990
Completion: December 1995
Duration of works: 66 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: , , ,
Coordinates: 48° 17' 22.26" N    8° 10' 5" E
Coordinates: 48° 17' 21.98" N    8° 10' 57.02" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 085 m
clear interior profile 9.50 x 4.50 m

Quantities

reinforcing steel 1 500 t
excavated material 110 000 m³
water proofing 27 000 m³
shotcrete 17 000 m³

Cost

cost of construction German Mark 47 600 000

Materials

tunnel structure reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20001170
  • Published on:
    15/12/2000
  • Last updated on:
    28/12/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine