General Information
Completion: | 28 January 1998 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Metro (rapid transit) network |
---|
Location
km | Name |
Technical Information
Dimensions
number of stations | 47 | |
system length | 52.0 km | |
maximum speed | 80 km/h | |
track gauge | 1 435 mm | |
number of lines | 4 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- 14.04: Temporary steel structures: for strengthening of a large excavation for new metro in Sofia. In: ce/papers, v. 1, n. 2-3 (September 2017), pp. 3871-3880. (2017):
- Survey of the Design of Back Anchors for Tunnel Boring Machines (TBM), Used in the Excavation of Metro Tunnels in Sofia. In: Procedia Engineering, v. 40 ( 2012), pp. 351-356. (2012):
- About this
data sheet - Structure-ID
20090452 - Published on:
06/02/2025 - Last updated on:
06/02/2025