0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2009
Completion: 23 May 2015
Status: in use

Project Type

Function / usage: Road tunnel
Structure: Tunnel with segmental lining
Construction method: Tunnel boring machine (TBM)

Location

Location: , ,
Address: N61-N62
Coordinates: 51° 17' 34.75" N    3° 50' 40.45" E
Coordinates: 51° 17' 29.51" N    3° 49' 34.91" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 330 m
tunnel length 1 145 m
number of lanes 2 x 2
TBM Boorbara diameter 11.34 m

Cost

cost of construction Euro 160 000 000

Materials

tubbings precast reinforced concrete

Chronology

27 January 2013

TBM Boorbara starts works for northern tube

Mid of May 2013

Northern tube breakthrough

8 August 2013

TBM Boorbara (diam. 11.34 m) starts works on southern tube.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20049377
  • Published on:
    03/12/2009
  • Last updated on:
    28/05/2021
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine