General Information
Project Type
Function / usage: |
Road tunnel |
---|---|
Structure: |
Tunnel with segmental lining |
Construction method: |
Tunnel boring machine (TBM) |
Location
Location: |
Terneuzen, Zeeland, Netherlands |
---|---|
Address: | N61-N62 |
Coordinates: | 51° 17' 34.75" N 3° 50' 40.45" E |
Coordinates: | 51° 17' 29.51" N 3° 49' 34.91" E |
Technical Information
Dimensions
total length | 1 330 m | |
tunnel length | 1 145 m | |
number of lanes | 2 x 2 | |
TBM Boorbara | diameter | 11.34 m |
Cost
cost of construction | Euro 160 000 000 |
Materials
tubbings |
precast reinforced concrete
|
---|
Chronology
27 January 2013 | TBM Boorbara starts works for northern tube |
---|---|
Mid of May 2013 | Northern tube breakthrough |
8 August 2013 | TBM Boorbara (diam. 11.34 m) starts works on southern tube. |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20049377 - Published on:
03/12/2009 - Last updated on:
28/05/2021