0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Sistema de Tren Eléctrico Urbano

General Information

Completion: 1 September 1989
Status: in use

Project Type

Function / usage: Public transit network

Location

km Name

Technical Information

Dimensions

number of tracks 2
number of stations 48
system length 46.5 km
track gauge 1 435 mm
number of lines 3

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20090007
  • Published on:
    12/12/2024
  • Last updated on:
    12/12/2024
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine