0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Placentia Lift Bridge
Beginning of works: March 2013
Completion: 23 September 2016
Status: in use

Project Type

Structure: Vertical lift bridge
Function / usage: Road bridge
Material: Steel bridge

Location

Location: , ,
To replace: Sir Ambrose Shea Bridge (1961)
Coordinates: 47° 15' 0.85" N    53° 57' 44.98" W
Show coordinates on a map

Technical Information

Dimensions

total length 93 m
span lengths 32 m - 33 m - 32 m
number of spans 3
length of movable section 33 m
vertical navigation clearance 3.05 - 21.34 m
horizontal navigation clearance 25 m
towers width 18.920 - 23.920 m
height 32.452 m

Cost

cost of construction Canadian dollar 47 700 000

Materials

deck steel
towers steel

Participants

Owner
Design
Architecture
Construction engineers
Geotechnical engineering
Contractor
Co-contractor
Steel construction
Mechanical & electrical engineering
Specialist consultants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20070513
  • Published on:
    20/01/2016
  • Last updated on:
    25/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine