General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Deck arch bridge |
Material: |
Reinforced concrete bridge |
Construction method: |
In-situ casting on falsework |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Baden, Argovia, Switzerland Obersiggenthal, Argovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 29' 2.12" N 8° 17' 57.46" E |
Technical Information
Dimensions
total length | 213.7 m | |
arch | rise | 25.4 m |
span | 117.3 m | |
deck | width | 19.09 m |
span lengths | 22.00 m - 2 x 24.50 m - 21.00 m - 16.80 m - 13.40 m - 22.00 m - 11.80 m - 13.40 m - 16.80 m - 21.00 m - 23.50 m | |
number of spans | 12 | |
girder depth | 1.84 m | |
roadway / carriageway width | 14.25 m | |
walkway width | 2 x 2.42 m |
Cost
cost of construction | ca. Swiss Franc 15 000 000 |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
arch |
reinforced concrete
|
piers on arch |
reinforced concrete
|
Participants
Design
Co-contractor
Prestressing
Bearings
Expansion joints
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Siggenthalerbrücke. Konzept und Ausführung der Bogenbrücke über die Limmat zwischen Baden und Obersiggenthal (AG). In: TEC21, v. 129, n. 44 (31 October 2003), pp. 7-12. (2003):
- About this
data sheet - Structure-ID
20012214 - Published on:
25/05/2004 - Last updated on:
10/02/2018