General Information
Other name(s): | Kai Tak Airport Taxiway Bridge |
---|---|
Beginning of works: | 1992 |
Completion: | 1993 |
Status: | in use |
Project Type
Structure: |
T-section girder bridge |
---|---|
Construction method: |
Precast girders with cast-in-situ slab |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Function / usage: |
original use: Taxiway bridge current use: Road bridge |
Location
Location: |
Kowloon City, Hong Kong, China |
---|---|
Coordinates: | 22° 18' 56.37" N 114° 12' 23.81" E |
Technical Information
Dimensions
main span | 36 m | |
total length | 220 m | |
number of spans | 7 | |
bearings | number | 207 |
deck | deck depth | 1.600 m |
deck slab thickness | 0.220 m | |
girder depth | 1.380 m |
Design Loads
live load | 2 x Boeing 747-400F | |
live load | B 747-400 |
Materials
deck |
precast prestressed concrete
|
---|---|
deck slab |
reinforced concrete
|
abutments |
reinforced concrete
|
girders |
precast prestressed concrete
|
Participants
Relevant Web Sites
Relevant Publications
- VSL Group Efion a Major Force in new Taxiway Bridge for Hong Kong. In: VSL News, v. 4, n. 2 ( 1993), pp. 8. (1993):
- About this
data sheet - Structure-ID
20004091 - Published on:
03/07/2002 - Last updated on:
04/08/2021