General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Haunched girder bridge Box girder bridge |
Construction method: |
Balanced cantilever method |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Awards and Distinctions
2017 |
for registered users |
---|
Location
Technical Information
Dimensions
main span | 142 m | |
total length | ca. 700 m | |
piers | height | max. 89 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
Case Studies and Applied Products
Strand tendons stabilize Sanagawa Bridge, Japan's fourth highest bridge
The Sanagawa Bridge is part of the New Tomei Expressway and spans the Sanagawa River in the city of Toyokawa. The design-build contract for the bridge also included the technical proposal for the constructio ... [more]
Participants
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20066310 - Published on:
01/08/2014 - Last updated on:
08/09/2020