0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 2005
Completion: 31 October 2009
Status: in use

Project Type

Structure: Tunnel
Construction method: Tunnel boring machine (TBM)
Function / usage: upper deck:
Road tunnel
lower deck:
Metro tunnel / subway tunnel

Location

Location: ,
Underneath of:
  • Yangtze River
Coordinates: 31° 22' 47.14" N    121° 42' 36.84" E
Coordinates: 31° 18' 37.96" N    121° 40' 40.89" E
Show coordinates on a map

Technical Information

Dimensions

length 8 900 m
number of lanes 2 x 3

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20067670
  • Published on:
    06/09/2015
  • Last updated on:
    11/09/2015
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine