General Information
Project Type
Structure: |
Tunnel |
---|---|
Construction method: |
Tunnel boring machine (TBM) |
Function / usage: |
upper deck: Road tunnel lower deck: Metro tunnel / subway tunnel |
Location
Location: |
Shanghai, China |
---|---|
Underneath of: |
|
Coordinates: | 31° 22' 47.14" N 121° 42' 36.84" E |
Coordinates: | 31° 18' 37.96" N 121° 40' 40.89" E |
Technical Information
Dimensions
length | 8 900 m | |
number of lanes | 2 x 3 |
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Calculation of longitudinal bending moment and shear force for Shanghai Yangtze River Tunnel: Application of lessons from Dutch research. In: Tunnelling and Underground Space Technology, v. 35 (April 2013), pp. 161-171. (2013):
- Infrastrutture da record in Cina. In: Strade e Autostrade, v. 11, n. 66 (November 2007), pp. 20. (2007):
- (2023): Study on Temperature Distribution along the Ultra-Long Underwater Tunnel: Based on the Long-Term Measured Results of the Shanghai Yangtze River Tunnel. In: Buildings, v. 13, n. 7 (28 June 2023), pp. 1804.
- Le TBM più grandi al mondo nel subalveo dello Yangtze a Shanghai. In: Strade e Autostrade, v. 11, n. 64 (July 2007), pp. 40. (2007):
- About this
data sheet - Structure-ID
20067670 - Published on:
06/09/2015 - Last updated on:
11/09/2015