General Information
Project Type
Function / usage: |
Maglev line |
---|
Location
km | Name |
Technical Information
Dimensions
total length | 30.035 km |
Design Loads
design speed | 430 km/h |
Chronology
March 2001 | Beginning of construction. |
---|---|
9 August 2002 | The first train arrives by ship in Shanghai. |
2005 | 10 million passengers expected. |
Participants
Client
Consulting engineers
Geotechnical engineering
Relevant Web Sites
Relevant Publications
- Fast Track. In: Civil Engineering Magazine, v. 74, n. 11 (November 2004). (2004):
- Guideway Structure, Maglev Demonstration Line, Shanghai. In: Structural Engineering International, v. 14, n. 1 (February 2004), pp. 21-23. (2004):
- The hybrid transrapid guideway development in Germany – First use in China. Presented at: IABSE Symposium: Structures for High-Speed Railway Transportation, Antwerp, Belgium, 27-29 August 2003, pp. 272-273. (2003):
- TRANSRAPID – A high speed magnetically levitated train system. Presented at: IABSE Symposium: Structures for High-Speed Railway Transportation, Antwerp, Belgium, 27-29 August 2003, pp. 274-275. (2003):
- Weichen für den Transrapid in Shanghai - Spitzenleistung des deutschen Stahlbaus. In: Stahlbau, v. 72, n. 5 (May 2003), pp. 356-361. (2003):
- About this
data sheet - Structure-ID
10000084 - Published on:
23/02/2002 - Last updated on:
28/05/2021