0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1909
Completion: 1911
Status: demolished

Project Type

Structure: Continuous truss bridge
Function / usage: Road bridge
Material: Steel bridge
Structure: Through truss bridge
Support conditions:
Material: Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Crossed:
  • Ohio River
Replaced by: Sewickley Bridge (1981)
Coordinates: 40° 31' 59.26" N    80° 11' 15.70" W
Show coordinates on a map

Technical Information

Dimensions

main span 220.7 m
total length 460 m

Materials

truss steel

Chronology

1948

Rehabilitated.

Participants

Engineering
Contractor

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20006130
  • Published on:
    11/10/2002
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine