General Information
Other name(s): | Seventh Ahvaz Bridge |
---|---|
Completion: | 1999 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Support conditions: |
for registered users |
Location
Location: |
Ahvaz, Khuzestan, Iran |
---|---|
Crosses: |
|
Coordinates: | 31° 20' 6.23" N 48° 41' 15.07" E |
Technical Information
Dimensions
span lengths | 30 m - 75 m - 2 x 140 m - 75 m - 30 m | |
number of spans | 6 |
Materials
deck |
prestressed concrete
|
---|
Participants
Design
Relevant Web Sites
Relevant Publications
- The River Karun Bridge, Iran. In: The Structural Engineer, v. 79, n. 16 ( 2001), pp. 19-23. (2001):
- About this
data sheet - Structure-ID
20033080 - Published on:
05/11/2007 - Last updated on:
26/11/2021