General Information
Other name(s): | Seßlestalbrücke |
---|---|
Official designation: | 5321/05 |
Beginning of works: | 2000 |
Completion: | 2002 |
Duration of works: | 28 months |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Steel-concrete composite bridge |
Location
Location: |
Suhl, Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 36' 48.50" N 10° 36' 31.68" E |
Technical Information
Dimensions
main span | 87.50 m | |
height | max. 50 m | |
total length | 320.00 m | |
span lengths | 72.50 m - 87.50 m - 87.50 m - 72.50 m | |
number of spans | 4 | |
horizontal radius of curvature | 1 200 m | |
superelevation | 4.5 % | |
deck | deck depth | 4.50 m |
deck width | 29 m |
Cost
cost of construction (incl. taxes) | German Mark 24 000 000 |
Materials
substructure |
reinforced concrete
|
---|---|
deck |
composite steel-reinforced concrete
|
Participants
Owner
Client
Original design
Structural engineering
- Köhler + Seitz Beraten und Planen GmbH
- Thorsten Wanzek (structural engineer)
Checking engineering
- Ulrich Weyer (checking engineer)
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brückenbauwerke in den neuen Bundesländern. Wilhelm Ernst & Sohn Verlag für Architektur und technische Wissenschaften GmbH, Berlin (Germany), 2004, pp. 197-201.
- About this
data sheet - Structure-ID
20002203 - Published on:
09/11/2001 - Last updated on:
05/02/2016