General Information
Beginning of works: | May 2010 |
---|---|
Completion: | 22 November 2011 |
Duration of works: | 20 months |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Rigid frame bridge with V-shaped legs |
Location
Location: |
Vienna 2 (Leopoldstadt), Vienna, Austria Vienna 11 (Simmering), Vienna, Austria |
---|---|
Coordinates: | 48° 10' 37.11" N 16° 27' 50.10" E |
Technical Information
There currently is no technical data available.
Participants
Owner
Design
Structural engineering
Checking engineering
Contractor
Relevant Web Sites
Relevant Publications
- Monitoring der Seitenhafenbrücke in Wien. In: Beton- und Stahlbetonbau, v. 109, n. 7 (July 2014), pp. 486-495. (2014):
- Seitenhafenbrücke in Wien. Ganzheitlicher Entwurf als Ziel. In: Brückenbau, v. 2, n. 3 ( 2010), pp. 6. (2010):
- Die Seitenhafenbrücke in Wien. In: Beton- und Stahlbetonbau, v. 107, n. 3 (March 2012), pp. 183-191. (2012):
- About this
data sheet - Structure-ID
20058256 - Published on:
15/09/2010 - Last updated on:
02/05/2016