General Information
Completion: | 1976 |
---|---|
Status: | completed |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Gennevilliers, Hauts-de-Seine (92), Ile-de-France, France |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Next to: |
Seine Bridge at Gennevilliers (1991)
|
Coordinates: | 48° 56' 58" N 2° 16' 49" E |
Technical Information
Dimensions
main span | 172 m | |
total length | 658 m | |
span lengths | 106 m - 172 m - 75 m - 172 m - 106 m | |
number of spans | 5 | |
deck | deck depth | 3.5 - 9 m |
deck width | 19.55 m | |
deck depth at abutments | 3.0 m |
Materials
superstructure |
prestressed concrete
|
---|
Chronology
1991 | An almost identical bridge is built alongside by Spie. |
---|
Participants
Owner
Client
- Direction Départementale de l'Equipement des Hauts-de-Seine
- Service Régional de l'Equipement de la Région
Design
- Jacques Mathivat (designer)
- Jean Muller (designer)
Architecture
- Alain Spielmann Architecte
- Domenc (architect)
-
Alain Spielmann Architecte
- Alain Spielmann (architect)
Construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- A15 - Pont sur la Seine et le chenal d'entrée Est au port de Gennevilliers. In: Bulletin annuel AFPC ( 1975), pp. 93-95.
- Franchissement de la Seine par l'autoroute A15 entre Gennevilliers et Argenteuil. In: Travaux, n. 508 (June 1977), pp. 70 - 80. (1977):
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 245. (1990):
- Les plus beaux ponts de France. Bonneton, Paris (France), pp. 165. (2001):
- Pont de Gennevilliers. Presented at: La Technique Française du Béton Précontraint, VIIIe Congrès de la FIP à Londres 1978, pp. 10-11.
- About this
data sheet - Structure-ID
20003096 - Published on:
16/02/2002 - Last updated on:
26/02/2019