General Information
Name in local language: | Viaducto de Segovia |
---|---|
Beginning of works: | 1872 |
Completion: | 13 October 1874 |
Status: | demolished (1934) |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Madrid, Madrid, Spain |
---|---|
Address: | Calle de Bailén / Calle de Segovia |
Replaced by: |
Segovia Viaduct (1942)
|
Coordinates: | 40° 24' 49.91" N 3° 42' 49.12" W |
Technical Information
Dimensions
width | 13 m | |
height | 19 m | |
span lengths | 40 m - 50 m - 40 m | |
number of spans | 3 | |
roadway / carriageway width | 8 m | |
walkway width | 2 x 2.50 m |
Materials
piers |
cast iron
|
---|
Chronology
1862 | Eugenio Barron is commissioned by the city council to desgin the bridge. |
---|---|
1934 | The bridge is demolished and replaced by the current Segovia Viaduct. |
Participants
Engineering
- Eugenio Barrón Avignon (engineer)
Relevant Web Sites
Relevant Publications
- Madrid: Prolongación de la calle de Bailen y puente de hierro para la de Segovia. In: Revista de Obras Públicas, v. 1, n. 9 ( 1861), pp. 217-224, 229-233. (1861):
- About this
data sheet - Structure-ID
20041042 - Published on:
10/12/2008 - Last updated on:
24/05/2023