General Information
Completion: | 27 March 2013 |
---|---|
Status: | in use |
Project Type
Structure: |
Half-through arch bridge Network arch bridge |
---|---|
Material: |
Steel bridge |
Function / usage: |
Road bridge |
Support conditions: |
for registered users |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Technical Information
Dimensions
length | 492 m | |
roadway / carriageway width | 2 x 7.0 m | |
walkway width | 2 x 2.0 m | |
vertical navigation clearance | 39 m | |
abutments | number | 2 |
arch | rise | 65 m |
arch span | 280 m |
Materials
piers |
reinforced concrete
|
---|---|
arches |
steel
|
piers on arch |
steel
|
Participants
Co-contractor
- IHI Corporation (main bridge)
- Kawada Industries (main bridge)
- Oriental Construction Co. (foundations)
- Yokogawa Bridge Corporation (main bridge)
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20086964 - Published on:
21/09/2023 - Last updated on:
21/09/2023