0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 5 March 2021
Completion: End of 2023
Status: under construction

Project Type

Location

Location: , , ,
Crosses:
  • Allier River
Coordinates: 46° 34' 1.44" N    3° 19' 8.08" E
Show coordinates on a map

Technical Information

Dimensions

abutments number 2

Materials

piers reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete
main girders steel

Participants

Steel construction

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086300
  • Published on:
    09/08/2023
  • Last updated on:
    09/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine