0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 18 September 1964
Completion: 20 March 1967
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Tyne River
Coordinates: 54° 58' 0.76" N    1° 41' 23.94" W
Show coordinates on a map

Technical Information

Dimensions

width 20.13 m
total length 138.9 m
clearance 7.6 m

Materials

deck steel
piers reinforced concrete
arches steel

Chronology

18 September 1964

Beginning of construction.

20 March 1967

Opened by Alderrnan Peter Renwick.

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20013209
  • Published on:
    02/09/2004
  • Last updated on:
    13/07/2017
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine