General Information
Project Type
Structure: |
Box girder bridge Haunched girder bridge |
---|---|
Material: |
Prestressed concrete bridge |
Structure: |
Two-span continuous girder bridge |
Location
Location: |
Sclayn, Andenne, Namur, Wallonia, Belgium Vezin, Andenne, Namur, Wallonia, Belgium |
---|---|
Crosses: |
|
Coordinates: | 50° 29' 27.33" N 5° 1' 34.13" E |
Technical Information
Dimensions
span lengths | 2 x 62.70 m - 10.00 m | |
number of spans | 3 | |
deck | deck depth | 1.43 - 4.75 m |
deck width | 10.60 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Initial construction (1949-1950)
Structural engineering
- Alexandre Birguer (consulting engineer)
Contractor
Renovation (1990-1992)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Le nouveau pont de Sclayn (Namur), ouvrage en béton précontraint de 130 mètres de portée sur la Meuse. In: La Technique des Travaux, v. 26, n. 5-6 (May 1950), pp. 175-180. (1950):
- Le pont de Sclayn. brochure, Francis Hambye, Brussels (Belgium). :
- Le pont de Sclayn à Namur. In: Travaux, n. 196 (February 1951), pp. 242.
- La reconstruction du pont de Sclayn (détails sur le cintre tubulaire). In: Ossature métallique, v. 15 (July 1950), pp. 340-341.
- Reconstruction du pont de Sclayn sur la Meuse. In: Travaux, n. 187 (May 1950), pp. 315. (1950):
- About this
data sheet - Structure-ID
20009896 - Published on:
07/08/2003 - Last updated on:
05/02/2016