0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Tunnel Schwetzingen
Beginning of works: 2008
Completion: 2010
Duration of works: 33 months
Status: in use

Project Type

Structure: Tunnel
Function / usage: Road tunnel
Construction method: Cut-and-cover method

Location

Location: , , ,
Address: B 535
Coordinates: 49° 23' 12" N    8° 35' 25" E
Coordinates: 49° 23' 24" N    8° 34' 59" E
Show coordinates on a map

Technical Information

Dimensions

northern tube length 650 m
clear interior profile 9.50 m x 4.85 m
southern tube length 450 m
clear interior profile 9.50 m x 4.85 m

Quantities

concrete volume 33 000 m³
reinforcing steel 3 300 t
excavated material 120 000 m³
volume of earthworks 180 000 m³

Participants

Owner
Client
Structural engineering
Geotechnical/geological experts
Architectural consulting
Checking engineering
Civil works
Construction management
Site supervision
Tunnel equipment

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20064691
  • Published on:
    06/03/2013
  • Last updated on:
    25/07/2014
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine