General Information
Other name(s): | Tunnel Schwetzingen |
---|---|
Beginning of works: | 2008 |
Completion: | 2010 |
Duration of works: | 33 months |
Status: | in use |
Project Type
Structure: |
Tunnel |
---|---|
Function / usage: |
Road tunnel |
Construction method: |
Cut-and-cover method |
Location
Location: |
Schwetzingen, Rhein-Neckar-Kreis, Baden-Württemberg, Germany |
---|---|
Address: | B 535 |
Coordinates: | 49° 23' 12" N 8° 35' 25" E |
Coordinates: | 49° 23' 24" N 8° 34' 59" E |
Technical Information
Dimensions
northern tube | length | 650 m |
clear interior profile | 9.50 m x 4.85 m | |
southern tube | length | 450 m |
clear interior profile | 9.50 m x 4.85 m |
Quantities
concrete volume | 33 000 m³ | |
reinforcing steel | 3 300 t | |
excavated material | 120 000 m³ | |
volume of earthworks | 180 000 m³ |
Participants
Owner
Client
Structural engineering
Geotechnical/geological experts
Architectural consulting
- H. Rothermund (architect)
Checking engineering
- Josef Steiner (checking engineer)
Civil works
Construction management
Site supervision
Tunnel equipment
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2012. Bundesministerium für Verkehr, Bau und Stadtentwicklung, Berlin (Germany), 2012, pp. 116-127.
- About this
data sheet - Structure-ID
20064691 - Published on:
06/03/2013 - Last updated on:
25/07/2014