General Information
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
T-section girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Location
Location: |
Schwerte, Unna (Kreis), North Rhine-Westphalia, Germany |
---|---|
Address: | Bethunestraße (B 236) |
Crosses: |
|
Carries: |
|
Replaces: |
Schwerte Bridge (1892)
|
Coordinates: | 51° 26' 11.23" N 7° 35' 0.37" E |
Technical Information
Dimensions
span lengths | 21.06 m - 3 x 18.06 m - 21.06 m | |
number of spans | 5 | |
deck | roadway / carriageway width | 7.00 m |
walkway width | 2 x 1.50 m | |
piers | thickness | 1.50 m |
Cost
cost of construction | Reichsmark 420 000 |
Materials
deck slab |
reinforced concrete
|
---|---|
girders |
steel
|
Participants
Co-contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Ruhrbrücken. Von der Quelle bis zur Mündung zwischen Einst und Jetzt. Ardey-Verlag, Münster (Germany), pp. 281-286. (2004):
- About this
data sheet - Structure-ID
20021317 - Published on:
05/05/2006 - Last updated on:
05/02/2016