General Information
Name in local language: | Moselbrücke Schweich |
---|---|
Beginning of works: | 1968 |
Completion: | 1970 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Schweich, Schweich an der Römischen Weinstraße, Trier-Saarburg, Rhineland-Palatinate, Germany Longuich, Schweich, Schweich an der Römischen Weinstraße, Trier-Saarburg, Rhineland-Palatinate, Germany |
---|---|
Crosses: |
|
Carries: |
|
Part of: | |
Coordinates: | 49° 48' 51.79" N 6° 45' 28.14" E |
Technical Information
Dimensions
total length | 987 m | |
main spans | 2 x 192 m | |
deck | deck depth | 4.10 - 9.80 m |
Materials
deck |
prestressed concrete
|
---|
Participants
Architecture
- Gerd Lohmer (architect)
Structural engineering
-
Dyckerhoff & Widmann AG
- Herbert Schambeck (structural engineer)
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken / Bridges. Ästhetik und Gestaltung / Aesthetics and Design. 4th edition, Deutsche Verlags-Anstalt, Stuttgart (Germany), pp. 164. (1994):
- Brücken in Deutschland für Straßen und Wege. Der Fotobildband deutscher Brückenbaukunst. Deutscher Bundesverlag, Cologne (Germany), ISBN 978-3-935064-41-5, pp. 96-97. (2006):
- Les grands ponts du monde: Ponts remarquables d'Europe. Brissaud, Poitiers (France), pp. 110. (1990):
- About this
data sheet - Structure-ID
20005061 - Published on:
16/09/2002 - Last updated on:
26/02/2019