General Information
Name in local language: | Schwarze-Elster-Brücke |
---|---|
Official designation: | BW 06 |
Beginning of works: | 2015 |
Completion: | 2018 |
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Bad Liebenwerda, Elbe-Elster, Brandenburg, Germany |
---|---|
Crosses: |
|
Coordinates: | 51° 30' 24.72" N 13° 24' 48.79" E |
Technical Information
Dimensions
total length | 192.00 m | |
span lengths | 33.50 m - 50.50 m - 66.50 m - 41.50 m | |
number of spans | 4 | |
bridge surface | 2 231 m² | |
superstructure | deck depth | 3.58 m |
deck width | 11.62 m |
Quantities
concrete volume | 4 210 m³ | |
prestressing steel | 82 t | |
reinforcing steel | 726 t |
Cost
cost of construction | ca. Euro 5 200 000 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Contractor
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Chronik des Brückenbaus. Presented at: 29. Dresdener Brückenbausysmposium, 11./12. März 2019, Dresden (Germany), pp. 197-208. (2019):
- About this
data sheet - Structure-ID
20077199 - Published on:
05/04/2019 - Last updated on:
05/04/2019