0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1995
Completion: 1997
Duration of works: 27 months
Status: in use

Project Type

Location

Location: , ,
Carries:
  • Autobahn A14
Part of:
Coordinates: 52° 7' 31.15" N    11° 31' 52.25" E
Show coordinates on a map

Technical Information

Dimensions

main span 55 m
total length 492 m
span lengths 42 m - 55 m - 5 x 68 m - 55 m
number of spans 8
bridge surface 14 514 m²
height above valley floor or water max. 24 m
deck deck depth 2.46 - 3.00 m

Quantities

reinforcing steel 1 900 t
deck structural steel 3 300 t
concrete volume 5 400 m³
substructure concrete volume 6 300 t [B25/B35]

Cost

cost of construction German Mark 28 300 000
cost of construction per m² German Mark 1950

Materials

piers reinforced concrete
girder steel
piles reinforced concrete
deck slab reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20009963
  • Published on:
    08/08/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine