General Information
Name in local language: | Schorgasttalbrücke |
---|---|
Beginning of works: | 2 October 2017 |
Completion: | 27 November 2020 |
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Structure: |
Cable-stayed bridge with fan system |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Cable-stayed bridge with curved deck |
Support conditions: |
for registered users |
Structure: |
Multiple-span cable-stayed bridge |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Material: |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! Structurae Plus/Pro - Subscribe Now! |
Structure: |
gallery: Slab bridge |
Secondary structure(s): |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Untersteinach, Kulmbach (Kreis), Bavaria, Germany |
---|---|
Address: | B289 |
Coordinates: | 50° 7' 36.72" N 11° 31' 33.75" E |
Technical Information
Dimensions
gallery | ||
---|---|---|
length | 86.33 m | |
bridge surface | 1 610 m² | |
deck | deck depth | 1.15 m |
piles | diameter | 1.20 - 1.50 m |
length | max. 15.50 m | |
main bridge | ||
length | 426.00 m | |
span lengths | 45.00 m - 5 x 67.20 m - 45.00 m | |
number of spans | 7 | |
horizontal radius of curvature | 900 m | |
bridge surface | 5 225 m² | |
deck | deck depth | 1.85 m |
piles | diameter | 1.50 m |
length | max. 54.00 m | |
pylon T40 | height | 23.47 m |
pylons | number | 6 |
stay cables | total length | 1 390 m |
overall structure | ||
total length | 512.33 m | |
bridge surface | 6 835 m² |
Quantities
gallery | ||
---|---|---|
concrete volume | 7 970 m³ | |
reinforcing steel | 1 480 t | |
piles | total length of piles | 850 m |
main bridge | ||
structural steel | 3 440 t | |
concrete volume | 3 070 m³ | |
reinforcing steel | 780 t | |
piles | total length of piles | 780 m |
Design Loads
overall structure | ||
---|---|---|
live load | LM1 (DIN EN 1991-2) | |
design code(s) | DIN EN 1991-2 |
Cost
overall structure | ||
---|---|---|
cost of construction | Euro 42 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
steel
|
pylons |
steel
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Design
- BPR Dr. Schäpertöns Consult GmbH & Co. KG
- SB Schultz-Brauns Planung-GmbH
- Schneider & Partner Ingenieur-Consult GmbH
Detailed design
- BPR Dr. Schäpertöns Consult GmbH & Co. KG
- SB Schultz-Brauns Planung-GmbH
- Schneider & Partner Ingenieur-Consult GmbH
Soil investigation report
Architectural consulting
Checking engineering
- Eberhard Garske (checking engineer)
Co-contractor
Steel construction
Stay cables
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2021. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2021, pp. 7-24.
- Die Schorgasttalbrücke – Herzstück der Ortsumgehung Untersteinach. Presented at: 31. Dresdner Brückenbausymposium, 7./8. Juni 2022, Dresden (Germany), pp. 163-172. (2022):
- About this
data sheet - Structure-ID
20079719 - Published on:
29/07/2020 - Last updated on:
19/06/2024