General Information
Completion: | 1963 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Prestressed concrete bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Inzigkofen, Sigmaringen (Kreis), Baden-Württemberg, Germany |
---|---|
Coordinates: | 48° 4' 48.61" N 9° 9' 8.73" E |
Technical Information
Dimensions
main span | 35 m | |
total length | 161.00 m | |
span lengths | 30.00 m - 33.00 m - 35.00 m - 33.00 m - 30.00 m | |
number of spans | 5 | |
bridge surface | 1 690 m² | |
deck | deck depth | 1.57 m |
deck width | 10.5 m | |
roadway / carriageway width | 7.50 m |
Quantities
concrete volume | 0.530 m³/m² | |
prestressing steel | 41.0 kg/m² | |
reinforcing steel content | 31.5 kg/m² |
Cost
cost of construction | German Mark 1 285 000 | |
cost of construction per m² | German Mark 760 |
Materials
superstructure |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Architecture
- Wilhelm Tiedje (architect)
Alternative design
Structural engineering
Checking engineering
- B. Seybold (checking engineer)
Contractor
Prestressing
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Hochstraßen. Planung - Ausführung - Beispiele. 2nd edition, Beton-Verlag GmbH, Düsseldorf (Germany), pp. 63, 200-201. (1967):
- About this
data sheet - Structure-ID
20006266 - Published on:
15/10/2002 - Last updated on:
02/04/2019