General Information
Project Type
Structure: |
Two-hinged arch bridge |
---|---|
Function / usage: |
Road bridge |
Material: |
Steel bridge |
Structure: |
Through arch bridge |
Location
Location: |
Straubing, Bavaria, Germany |
---|---|
Crosses: |
|
Replaces: |
Schloßbrücke Straubing (1896)
|
Coordinates: | 48° 53' 9.47" N 12° 34' 26.07" E |
Technical Information
Dimensions
arch span | 91.5 m | |
deck | deck width | 14.6 m |
Materials
arch |
steel
|
---|
Chronology
1946 | Strengthening of the existing abutments begin as the new bridge is expected to have a higher dead weight and live loading than the previous bridge. |
---|---|
October 1993
— August 1994 |
Bridge is strengthened for DIN 1072 loading and the deck rebuilt. |
Participants
Initial construction
Construction
Reconfiguration
Design
Contractor
- Josef Pfaffinger Bauunternehmung (substructure)
- Voest Alpine MCE
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Geschichte und Umbau der Schloßbrücke Straubing. Presented at: 3. Internationale Donaubrückenkonferenz, 3rd International Conference on Bridges across the Danube, 29-30/10/1998, Regensburg, Germany, pp. 373-388. (1998):
- About this
data sheet - Structure-ID
20003929 - Published on:
23/06/2002 - Last updated on:
27/07/2020