General Information
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Haunched girder bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Nahetal-Waldau, Hildburghausen (Kreis), Thuringia, Germany Auengrund, Hildburghausen (Kreis), Thuringia, Germany |
---|---|
Carries: |
|
Part of: | |
Coordinates: | 50° 29' 18.46" N 10° 48' 43.18" E |
Technical Information
Dimensions
main span | 80 m | |
width | 2 x 14.25 m | |
total length | 680 m | |
span lengths | 55 m - 72.5 m - 3 x 80 m - 75 m - 72.5 m - 67 m - 58 m - 40 m | |
number of spans | 10 | |
height above valley floor or water | 40 m | |
girder depth | 3.0 - 4.5 m |
Cost
cost of construction | Euro 20 000 000 |
Materials
deck |
composite steel-reinforced concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Owner
Client
Original design
Architecture
- Axel Oestreich (architect)
Structural engineering
- IWS Beratende Bauingenieure (substructure)
- Schmitt Stumpf Frühauf und Partner Ingenieurgesellschaft im Bauwesen mbH (superstructure)
Co-contractor
Subcontractor
Relevant Web Sites
There currently are no relevant websites listed.
- About this
data sheet - Structure-ID
20016872 - Published on:
14/07/2005 - Last updated on:
11/02/2018