General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Construction method: |
Balanced cantilever method |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Location
Location: |
Schinznach-Bad, Argovia, Switzerland |
---|---|
Crosses: |
|
Coordinates: | 47° 27' 42.81" N 8° 9' 40.05" E |
Technical Information
Dimensions
total length | 1209.5 m | |
main spans | 2 x 90 m | |
number of spans | 23 |
Materials
deck |
prestressed concrete
|
---|
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Post-tensioning of Aare River bridge now underway in Switzerland. In: VSL News, v. 1, n. 1 ( 1990), pp. 12. (1990):
- About this
data sheet - Structure-ID
20004033 - Published on:
30/06/2002 - Last updated on:
05/02/2016