0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Other name(s): Multnomah Channel Bridge
Beginning of works: 4 January 2006
Completion: 23 June 2008
Status: in use

Project Type

Location

Location: , ,
Address: FAS A668
To replace: Multnomah Channel Bridge (1948)
Location description:

Crosses over Multnomah Channel to connect Sauvie Island north of Portland.

Coordinates: 45° 37' 39.64" N    122° 48' 59.72" W
Show coordinates on a map

Technical Information

Dimensions

main span 112 m

Cost

cost of construction United States dollar 43 000 000

Materials

piers reinforced concrete
deck of main span steel
arches steel
deck of approach viaducts prestressed concrete
abutments reinforced concrete

Chronology

23 June 2008

Opened to traffic.

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

  • About this
    data sheet
  • Structure-ID
    20029052
  • Published on:
    15/10/2007
  • Last updated on:
    16/02/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine