0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1930
Completion: 17 May 1935
Status: in use

Project Type

Structure: main bridge:
Through truss bridge
main bridge:
Continuous truss bridge
approach viaduct:
Deck truss bridge
Function / usage: Railroad (railway) bridge
Material: Steel bridge
Structurae Plus/Pro - Subscribe Now!

Location

Location: , , ,
Crosses:
  • Volga River
Coordinates: 51° 24' 43.49" N    45° 58' 49.01" E
Show coordinates on a map

Technical Information

Dimensions

total length 1 730 m
span lengths 3 x 66 m - 160 m - 130 m - 190 m - 130 m - 190 m - 130 m - 160 m - 6 x 67 m
number of spans 16
number of tracks 1

Materials

piers reinforced concrete
truss steel

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20035741
  • Published on:
    25/03/2008
  • Last updated on:
    02/09/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine