General Information
Project Type
Structure: |
Vertical lift bridge |
---|---|
Function / usage: |
Road bridge Railroad (railway) bridge |
Material: |
Steel bridge |
Location
Location: |
Portsmouth, Rockingham County, New Hampshire, USA Kittery, York County, Maine, USA |
---|---|
Crosses: |
|
Coordinates: | 43° 5' 9.24" N 70° 45' 39.28" W |
Technical Information
Materials
deck truss |
steel
|
---|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
Relevant Publications
- Analyzing Prerepair and Postrepair Vibration Data from the Sarah Mildred Long Bridge after Ship Collision. In: Journal of Bridge Engineering (ASCE), v. 21, n. 3 (March 2016), pp. 05015002. (2016):
- About this
data sheet - Structure-ID
20007191 - Published on:
10/12/2002 - Last updated on:
15/10/2019