General Information
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Material: |
Prestressed concrete bridge Steel-concrete composite bridge |
Structure: |
Haunched girder bridge |
Location
Technical Information
Dimensions
total length | 195 m | |
span lengths | 30 m - 135 m - 30 m | |
deck width | 2 x 11.75 m | |
number of spans | 3 | |
number of lanes | 2 x 2 |
Notes
San Carlos Viaduct has a hybrid deck where the end spans and part of the main span are made of post-tension concrete box girders while the middle portion of the main span consists of a composite Corten steel box with a concrete deck slab.
Participants
Owner
Design
Main contractor
Steel construction
Prestressing steel
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Viaducto del R4. Presented at: Congreso Internacional de Estructuras VI, Madrid, 3-6 Junio 2014. (2014):
- About this
data sheet - Structure-ID
20068064 - Published on:
23/11/2015 - Last updated on:
05/02/2016