General Information
Completion: | 2011 |
---|---|
Status: | in use |
Project Type
Function / usage: |
Road bridge |
---|---|
Construction method: |
Lateral / transverse launching |
Support conditions: |
for registered users |
Plan view: |
Structurae Plus/Pro - Subscribe Now! |
Structure: |
Two-span continuous girder bridge |
Material: |
Steel-reinforced concrete composite bridge |
Structure: |
Multiple girder bridge |
Awards and Distinctions
2012 |
commendation
for registered users |
---|
Location
Location: |
American Fork, Utah County, Utah, USA |
---|---|
Address: | East 1100 South Street |
Crosses: |
|
Crosses: |
Interstate 15 (1957)
|
Coordinates: | 40° 21' 19.24" N 111° 46' 38.40" W |
Technical Information
Dimensions
main span | 53.95 m | |
total length | 107.9 m | |
span lengths | 2 x 53.95 m | |
number of spans | 2 | |
number of lanes | 3 | |
abutments | number | 2 |
deck | deck width | 23.42 m |
on-center distance between girders | 4.11 m | |
number of longitudinal girders | 6 | |
piers | number | 6 |
Quantities
structural steel | 523 t |
Cost
cost of construction | United States dollar 5 100 000 |
Materials
piers |
reinforced concrete
|
---|---|
abutments |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Design
General contractor
Steel detailing
Steel fabrication
Launching
Relevant Web Sites
- About this
data sheet - Structure-ID
20088620 - Published on:
01/06/2024 - Last updated on:
01/06/2024