General Information
Completion: | 2002 |
---|---|
Status: | in use |
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Prestressed concrete bridge Fiber-reinforced concrete bridge |
Structure: |
Haunched girder bridge |
Construction method: |
Precast segmental construction |
Support conditions: |
for registered users |
Location
Technical Information
Dimensions
width | 2.4 m | |
span | 49.35 m | |
length | 50.200 m |
Materials
girder |
high-strength, precast and prestressed concrete
|
---|
Notes
First application of UHP concrete Ductal® in Japan.
Participants
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Devloping by diversifying. In: News. The VSL-Intrafor Magazine, v. 14, n. 1 ( 2003), pp. 6-11.
- Footbridge Awards 2005. In: Bridge Design & Engineering, v. 11, n. 41 (4th Quarter 2005), pp. 35-49. (2005):
- Innovative design and construction of Sakata-Mirai footbridge by reactive powder concrete. Presented at: Footbridge 2005 (Second International Congress), Venezia, 06-08 December 2005. (2005):
- About this
data sheet - Structure-ID
20010579 - Published on:
02/11/2003 - Last updated on:
01/10/2020