General Information
Completion: | 2012 |
---|---|
Status: | in use |
Project Type
Structure: |
Bowstring-arch-truss bridge |
---|---|
Function / usage: |
Pedestrian bridge (footbridge) |
Material: |
Steel bridge |
Structure: |
Pratt type truss bridge |
Location
Location: |
Valletta, Malta Island, Malta |
---|---|
Coordinates: | 35° 54' 10.40" N 14° 31' 15.62" E |
Technical Information
Dimensions
span | 70 m | |
truss | height | 1.83 - 7.20 m |
Materials
deck |
steel
|
---|---|
truss |
steel
|
deck flooring |
wood
|
Participants
Design
Structural engineering
Steel erection
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Bridging a 70-year historic gap at Valletta Grand Harbour. Design and construction of the new St. Elmo Breakwater Footbridge (Malta). Presented at: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014. (2014):
- Reconstruction of a Steel Footbridge at Valletta Grand Harbour Breakwater (Malta). Presented at: 4th International Conference Footbridge 2011, Wroclaw, Poland, 6-8 July 2011. (2011):
- St. Elmo Bridge, Breakwater and Lighthouse, Malta. In: e-mosty, v. 2022, n. 3 (September 2022), pp. 50-63. (2022):
- About this
data sheet - Structure-ID
20071920 - Published on:
20/10/2016 - Last updated on:
09/06/2017