General Information
Status: | in use |
---|
Project Type
Structure: |
Box girder bridge |
---|---|
Function / usage: |
Motorway bridge / freeway bridge |
Structure: |
Haunched girder bridge |
Material: |
Prestressed concrete bridge |
Construction method: |
main bridge: Balanced cantilever method |
Material: |
Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Alcácer do Sal, Setúbal, Portugal |
---|---|
Address: | A2/IP1 |
Crosses: |
|
Coordinates: | 38° 21' 59.39" N 8° 29' 21.47" W |
Technical Information
Dimensions
deck | width | 19.00 m |
approach viaduct | ||
---|---|---|
total length | 1 452 m | |
main bridge | ||
main span | 135 m | |
total length | 302 m |
Materials
deck |
prestressed concrete
|
---|---|
piers |
reinforced concrete
|
abutments |
reinforced concrete
|
Participants
Currently there is no information available about persons or companies having participated in this project.
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Designing bridges - A quest for beauty. Presented at: fib Symposium 2004, 26-28 April 2004, Avignon, pp. 35-50. (2004):
- About this
data sheet - Structure-ID
20012534 - Published on:
26/07/2004 - Last updated on:
14/11/2023