General Information
Project Type
Function / usage: |
Avalanche gallery |
---|---|
Material: |
Reinforced concrete structure |
Construction method: |
Precast girders with cast-in-situ slab |
Location
Location: |
Schneizlreuth, Berchtesgadener Land, Bavaria, Germany |
---|---|
Address: | B21 |
Technical Information
Dimensions
total length | 139 m | |
number of lanes | 2 x 1 | |
clear distance | 9.80 m | |
deck slab | thickness | 0.45 m |
precast elements (RC) | width | 0.50 m |
height | 0.75 m |
Quantities
concrete volume | 6 200 m³ | |
reinforcing steel | 570 t | |
shotcrete | 1 900 m² |
Materials
deck slab |
reinforced concrete
|
---|---|
columns |
reinforced concrete
|
girders |
precast reinforced concrete
|
Participants
Owner
Client
Design
Structural engineering
Soil investigation report
Checking engineering
- Walthari Fuchs (checking engineer)
Contractor
Construction management
Site supervision
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Brücken und Tunnel der Bundesfernstraßen 2016. Bundesministerium für Verkehr und digitale Infrastruktur, Berlin (Germany), 2016, pp. 153-166.
- About this
data sheet - Structure-ID
20072790 - Published on:
30/03/2017 - Last updated on:
01/06/2017