0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Completion: 2 August 2003
Status: in use

Project Type

Function / usage: Road bridge

Location

Location: , ,
Crosses:
  • Rufiji
Coordinates: 8° 0' 53.05" S    38° 58' 13.41" E
Show coordinates on a map

Technical Information

Dimensions

total length 13.5 km

Cost

cost of construction United States dollar 29 000 000

Chronology

2 August 2003

Inauguration by President Benjamin Mkapa.

Participants

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20009986
  • Published on:
    11/08/2003
  • Last updated on:
    05/02/2016
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine