0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Beginning of works: 1925
Completion: 1928
Status: in use

Project Type

Location

Location: , , , ,
Crosses:
  • Tweed River
Coordinates: 55° 46' 6.94" N    2° 0' 31.99" W
Show coordinates on a map

Technical Information

Dimensions

main span 108.50 m
span lengths 50.10 m - 74.40 m - 95.50 m - 108.50 m
number of spans 4

Materials

piers reinforced concrete
arches reinforced concrete

Participants

Relevant Web Sites

Relevant Publications

  • About this
    data sheet
  • Structure-ID
    20002267
  • Published on:
    11/11/2001
  • Last updated on:
    30/12/2019
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine