0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Rottweil Northern Bybass Viaduct

General Information

Name in local language: Neckartalbrücke Rottweil; Talbrücke Nordumgehung Rottweil
Beginning of works: 1999
Completion: 2002
Status: in use

Project Type

Location

Location: , , ,
Crosses:
  • Neckar River
Carries:
  • Bundesstrasse B 27
Coordinates: 48° 10' 56.59" N    8° 37' 46.53" E
Show coordinates on a map

Technical Information

Dimensions

total length 295.00 m
span lengths 45.00 m - 50.00 m - 58.00 m - 72.00 m - 70.00 m
number of spans 5
bridge surface 4380 m²
clear length between abutments 293.80 m
deck deck width 14.85 m

Materials

deck prestressed concrete
piers reinforced concrete
abutments reinforced concrete

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20006920
  • Published on:
    21/11/2002
  • Last updated on:
    22/07/2020
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine