General Information
Name in local language: | Talbrücke Rothof |
---|---|
Beginning of works: | 1961 |
Completion: | 1965 |
Status: | to be demolished |
Project Type
Function / usage: |
Motorway bridge / freeway bridge |
---|---|
Structure: |
Girder bridge |
Material: |
Steel-reinforced concrete composite bridge Structurae Plus/Pro - Subscribe Now! |
Location
Location: |
Rottendorf, Würzburg (Kreis), Bavaria, Germany |
---|---|
Replaced by: |
Rothof Viaduct (2022)
|
Carried: |
A 7 Motorway (Germany)
|
Coordinates: | 49° 48' 9.97" N 10° 2' 52.54" E |
Technical Information
Dimensions
span lengths | 35.0 m - 50.0 m - 4 x 60.0 m - 50.0 m - 35.0 m | |
deck width | 29.000 m | |
number of spans | 8 | |
height above valley floor or water | ca. 30 m | |
number of lanes | 2 x 2 |
Design Loads
live load | Brückenklasse 60 | |
design code(s) | DIN 1072 | |
military load class | MCI 100/50 (STANAG 2021) |
Materials
piers |
reinforced concrete
|
---|---|
deck slab |
reinforced concrete
|
girders |
steel
|
Participants
Owner
Client
Checking engineering
- Hans Grassl (checking engineer)
Main contractor
Steel construction
Concrete construction
Relevant Web Sites
There currently are no relevant websites listed.
Relevant Publications
- Die Autobahn-Talbrücke Rothhof. In: Stahlbau, v. 34, n. 9 (September 1965), pp. 275-283. (1965):
- About this
data sheet - Structure-ID
20055195 - Published on:
14/03/2010 - Last updated on:
02/03/2020