0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

General Information

Name in local language: Rossåstunnelen
Beginning of works: March 2022
Completion: 2025
Status: under construction

Project Type

Structure: Tunnel
Function / usage: Road tunnel

Location

Location: ,
Address: E39
Coordinates: 58° 9' 29.90" N    7° 7' 56.84" E
Coordinates: 58° 11' 4.89" N    7° 6' 19.16" E
Show coordinates on a map

Technical Information

Dimensions

length 2 x 3 400 m

Chronology

July 2023 Breakthrough

Participants

Currently there is no information available about persons or companies having participated in this project.

Relevant Web Sites

There currently are no relevant websites listed.

  • About this
    data sheet
  • Structure-ID
    20086584
  • Published on:
    21/08/2023
  • Last updated on:
    21/08/2023
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine